Featured story
The Summer Sprint to Finish Old St. Mary’s
A September wedding gave volunteers a finish line during the hot summer of 2007.
The Quarry Quarterly · Summer 2007 · 4 pages
Wiring, heating, woodwork, and granite steps all form part of the push to prepare St. Mary’s for a September wedding. This edition records the project while it was still under way, preserving the contributions and practical details behind the finished chapel.
Stories from this issue
Featured story
A September wedding gave volunteers a finish line during the hot summer of 2007.
From the archive
A small marble slab opened a much larger historical question.
The original edition, page by page
Use the arrows to turn pages. Open fullscreen for a closer look, or zoom in on photographs and stories.
Open the original PDF in a new tab ↗ · Prefer a copy? Use your PDF viewer’s download or print controls.
From the Rocklin Historical Society archive. This page introduces the Summer 2007 edition and preserves its original newsletter. Events, offers, and contact details inside reflect the time of publication.